MILESTONES AND DELIVERABLES

 

 

The following table contains the list of Deliverables and Milestones for the SLHC-PP Project:

Deliverables:

Number Deliverable title Nature Delivery month Link
1.2.1 SLHC-PP web-site operational (intranet + public pages) O M03

Report

3.1.1 Project management structure and review office for R&D phase in place  O, R M06 Report
2.2.1 Functioning collaboration communication structure O M12

Report

2.2.2 Project web site linked to the technical databases: Machine layout database, hardware baseline database, project notes and reports O M12

Report

4.1.1 Project Structures for construction of systems and sub-systems O, R M12

Report

4.2.1 Personnel and working practices of the Technical Coordination unit in place O, R M12

Report

6.1.1 Basic design of the triplet R M12

Report 1 & 2

7.1.1 Finite element thermal study of the Linac 4 design source at the final duty factor R M12

Report

7.2.1 In depth characterisation of the two tuners plus cavities developed in the frame of the “HIPPI” JRA , FP6 (tuner/cavity characteristics) R M22

Report

8.1.1 Evaluation report on DC-DC conversion technologies R M12

Report

8.2.1 Evaluation report on generic serial powering studies and specification of serial powering components R M12

Report

 

Number Deliverable title Nature Delivery month Link
1.1.1 Periodic Report (progress of work + use of resources + financial statement) R M14 Report
4.2.2 Key structural requirements (information repository, tools, coordination framework, safety and quality systems, integration office) and scheduling and reporting mechanisms in place O, R M18 Report
7.1.2  Design of a high duty factor plasma generator  R M18 Report
7.2.2 Design of RF system architecture including modelling of RF components, simulation of the RF system and simulation of beam dynamics of the full LINAC; RF system and high power modulator specifications R M27 Report
3.2.1 Document the technical scope of the upgrade including an initial cost-estimate R M24 Report
5.1.1 Validation of simulation tools with measurements at LHC R M24 Report
5.1.2 Estimation of radiation and activation levels for critical areas of the experiments at SLHC R M26 Report
5.2.1 Estimation of radiation and activation levels for critical areas of SLHC and its injectors R M24 Report
8.2.2 Custom serial powering circuitry and evaluation of generic high-current serial powering ASIC P,R M24 Report

 

Number Deliverable title Nature Delivery month Link
1.1.2 Periodic Report (progress of work + use of resources + financial statement) R M26 Report
6.3.1 Construction corrector magnet package P M26 Report
2.1 1 Common fund, Financial Management System (software) and user requirements and user guide document O M30 Report
2.1.2 Quality Assurance plan for the implementation phase R M30 Report
7.1.3 Construction of the plasma generator and sub-systems (e.g. 2Hz RF generator, hydrogen gas injection and pumping) D M30 Report
7.2.3 Production of a prototype electronic system and other elements for a full system demonstration; Definition of demonstration procedure P M30 Report
8.1.2 Prototypes and viability report P, R M30 Report
3.2.2 Schedule for the upgraded detector parts and for the S-ATLAS installation  R M32 Report
6.2.1* Construction of 2 instrumented collar packs D M32 Report
6.2.2* Assessment of the collaring procedure and definition of final coli size D M33 Report
2.1.3 Earned Value management system (software) with user requirements and user guide document O M36 Report
3.1.2 Establish the initial Memorandum of Understanding for the upgrade  R M36 Report
3.1.3 Develop detailed cost books for the upgrade including the installation phase  R M36 Report
3.2.3 Technical documentation, drawing and CAD information for the existing experiment and the upgraded elements  R M36 Report
4.1.2 Cost book and MoU for the upgrade and installation phase R M36 Report
4.2.3 Pilot design and schedule for the upgrade project published. R M36 Report
5.3.1 Impact Study (dose rates, environmental impact and waste production from activated material) for SLHC R M36 Report
6.1.2 Complete Interaction Region design  R M36 Report
6.3.2* Assembly of a 2m long prototype quadrupole D M36 Report
7.1.4 Plasma generation and study of the thermal and vacuum conditions R M36 Report
7.2.4 Full test and validation of RF system. Final report D M36 Report
8.1.3 Integration in full-scale detector modules  D M36 Report
8.2.3 Full-scale super-module with custom serial powering circuitry D M36 Report
1.1.3 Periodic Report (progress of work + use of resources + financial statement) R M38 Report
1.1.4 Final report R M38 Report
 

Milestones:

First year of the project:

Number Milestone title Delivery month Comment Link
1.1 Kick-off meeting M03 Presentations on SLHC-PP web site Agenda
6.1 Qualification of magnet components M08 Qualification document published Report
3.1 Schedule for the R&D phase  M09 Schedule document Report
6.2 Basic Magnet design M10 Magnet design report

Report

1.2 First Annual SLHC-PP Meeting M12 Presentations on SLHC-PP web site Agenda
5.1 Compilation and evaluation of design parameters and details relevant for the assessment of radiological impact; Identification of critical parameters and potential design constraints M12 Meeting with stakeholders in accelerator and experiments, to define an agreement on design parameters

Report

Second year of the project:

Number Milestone title Delivery month Comment Link
7.1 List of required improvements for the design of the high duty factor plasma generator to function at a high duty factor M14 Report approved by partners Report
2.1 Financial management system (initial version) M18 Initial version released Report
4.1 Upgrade Project Scope defined M18 Report published Report
6.3 Complete cold mass design M18 Design Report published Report (in EDMS)
6.4 Complete cryomagnet design M22 Design Report published Report
1.3 Second Annual SLHC-PP Meeting M24 Presentations on SLHC-PP web site Agenda
2.2 EVM software (initial version) M26 Initial version released Report (in EDMS)
3.2 Upgrade project structures adapted to the implementation phase M24 Documented as WEB structure Report

Third year of the project:

Number Milestone title Delivery month Comment

Link

6.6 Electrical test of collared coil M28 Test report published Report
6.7 Cold test of corrector magnet M28 Test report published Report
1.4 Third Annual Meeting and Final Project Review M36 Presentations on SLHC-PP web site Agenda

 

 

 