Number |
Deliverable title |
Nature |
Delivery month |
Link |
1.2.1 |
SLHC-PP web-site operational
(intranet + public pages) |
O |
M03 |
Report
|
3.1.1 |
Project management structure and
review office for R&D phase in place |
O, R |
M06 |
Report |
2.2.1 |
Functioning collaboration
communication structure |
O |
M12 |
Report
|
2.2.2 |
Project web site linked to the
technical databases: Machine layout database, hardware baseline
database, project notes and reports |
O |
M12 |
Report
|
4.1.1 |
Project Structures for construction
of systems and sub-systems |
O, R |
M12 |
Report
|
4.2.1 |
Personnel and working practices of
the Technical Coordination unit in place |
O, R |
M12 |
Report
|
6.1.1 |
Basic design of the triplet |
R |
M12 |
Report
1 &
2
|
7.1.1 |
Finite element thermal study of the
Linac 4 design source at the final duty factor |
R |
M12 |
Report
|
7.2.1 |
In depth characterisation of the
two tuners plus cavities developed in the frame of the “HIPPI”
JRA , FP6 (tuner/cavity characteristics) |
R |
M22 |
Report
|
8.1.1 |
Evaluation report on DC-DC
conversion technologies |
R |
M12 |
Report
|
8.2.1 |
Evaluation report on generic serial
powering studies and specification of serial powering components |
R |
M12 |
Report
|
Number |
Deliverable title |
Nature |
Delivery month |
Link |
1.1.1 |
Periodic Report (progress of work +
use of resources + financial statement) |
R |
M14 |
Report |
4.2.2 |
Key structural requirements
(information repository, tools, coordination framework, safety
and quality systems, integration office) and scheduling and
reporting mechanisms in place |
O, R |
M18 |
Report |
7.1.2 |
Design of a high duty factor plasma
generator |
R |
M18 |
Report |
7.2.2 |
Design of RF system architecture
including modelling of RF components, simulation of the RF
system and simulation of beam dynamics of the full LINAC; RF
system and high power modulator specifications |
R |
M27 |
Report |
3.2.1 |
Document the technical scope of the
upgrade including an initial cost-estimate |
R |
M24 |
Report |
5.1.1 |
Validation of simulation tools with
measurements at LHC |
R |
M24 |
Report |
5.1.2 |
Estimation of radiation and
activation levels for critical areas of the experiments at SLHC |
R |
M26 |
Report |
5.2.1 |
Estimation of radiation and
activation levels for critical areas of SLHC and its injectors |
R |
M24 |
Report |
8.2.2 |
Custom serial powering circuitry
and evaluation of generic high-current serial powering ASIC |
P,R |
M24 |
Report |
Number |
Deliverable title |
Nature |
Delivery month |
Link |
1.1.2 |
Periodic Report (progress of work +
use of resources + financial statement) |
R |
M26 |
Report |
6.3.1 |
Construction corrector magnet
package |
P |
M26 |
Report |
2.1 1 |
Common fund, Financial Management
System (software) and user requirements and user guide document |
O |
M30 |
Report |
2.1.2 |
Quality Assurance plan for the
implementation phase |
R |
M30 |
Report |
7.1.3 |
Construction of the plasma
generator and sub-systems (e.g. 2Hz RF generator, hydrogen gas
injection and pumping) |
D |
M30 |
Report |
7.2.3 |
Production of a prototype
electronic system and other elements for a full system
demonstration; Definition of demonstration procedure |
P |
M30 |
Report |
8.1.2 |
Prototypes and viability report |
P, R |
M30 |
Report |
3.2.2 |
Schedule for the upgraded detector
parts and for the S-ATLAS installation |
R |
M32 |
Report |
6.2.1* |
Construction of 2 instrumented
collar packs |
D |
M32 |
Report |
6.2.2* |
Assessment of the collaring procedure and definition of final
coli size |
D |
M33 |
Report |
2.1.3 |
Earned Value management system
(software) with user requirements and user guide document |
O |
M36 |
Report |
3.1.2 |
Establish the initial Memorandum of
Understanding for the upgrade |
R |
M36 |
Report |
3.1.3 |
Develop detailed cost books for the
upgrade including the installation phase |
R |
M36 |
Report |
3.2.3 |
Technical documentation, drawing
and CAD information for the existing experiment and the upgraded
elements |
R |
M36 |
Report |
4.1.2 |
Cost book and MoU for the upgrade
and installation phase |
R |
M36 |
Report |
4.2.3 |
Pilot design and schedule for the
upgrade project published. |
R |
M36 |
Report |
5.3.1 |
Impact Study (dose rates,
environmental impact and waste production from activated
material) for SLHC |
R |
M36 |
Report |
6.1.2 |
Complete Interaction Region design |
R |
M36 |
Report |
6.3.2* |
Assembly of a 2m long prototype quadrupole |
D |
M36 |
Report |
7.1.4 |
Plasma generation and study of the
thermal and vacuum conditions |
R |
M36 |
Report |
7.2.4 |
Full test and validation of RF
system. Final report |
D |
M36 |
Report |
8.1.3 |
Integration in full-scale detector
modules |
D |
M36 |
Report |
8.2.3 |
Full-scale super-module with custom
serial powering circuitry |
D |
M36 |
Report |
1.1.3 |
Periodic Report (progress of work +
use of resources + financial statement) |
R |
M38 |
Report |
1.1.4 |
Final report |
R |
M38 |
Report |
Number |
Milestone title |
Delivery month |
Comment |
Link |
1.1 |
Kick-off meeting |
M03 |
Presentations on SLHC-PP web site |
Agenda |
6.1 |
Qualification of magnet components |
M08 |
Qualification document published |
Report |
3.1 |
Schedule for the R&D phase |
M09 |
Schedule document |
Report |
6.2 |
Basic Magnet design |
M10 |
Magnet design report |
Report
|
1.2 |
First Annual SLHC-PP Meeting |
M12 |
Presentations on SLHC-PP web site |
Agenda |
5.1 |
Compilation and evaluation of
design parameters and details relevant for the assessment of
radiological impact; Identification of critical parameters and
potential design constraints |
M12 |
Meeting with stakeholders in
accelerator and experiments, to define an agreement on design
parameters |
Report
|
Number |
Milestone title |
Delivery month |
Comment |
Link |
7.1 |
List of required improvements for
the design of the high duty factor plasma generator to function
at a high duty factor |
M14 |
Report approved by partners |
Report |
2.1 |
Financial management system
(initial version) |
M18 |
Initial version released |
Report |
4.1 |
Upgrade Project Scope defined |
M18 |
Report published |
Report |
6.3 |
Complete cold mass design |
M18 |
Design Report published |
Report (in EDMS) |
6.4 |
Complete cryomagnet design |
M22 |
Design Report published |
Report |
1.3 |
Second Annual
SLHC-PP Meeting |
M24 |
Presentations on SLHC-PP web site |
Agenda |
2.2 |
EVM software (initial version) |
M26 |
Initial version released |
Report (in EDMS) |
3.2 |
Upgrade project structures adapted
to the implementation phase |
M24 |
Documented as WEB structure |
Report |